Linden, NC · Upcoming 24 Dec 2026 cycle
NR76
Barker Fld
No changes found at NR76 yetThe FAA hasn't posted this cycle's instrument procedures yet, so approach and other procedure changes aren't shown yet. Amend adds them once the FAA does.
History since Aug 2024
▶Effective 10 Jul 2025FYI 2
Remark
Remark updated: 35 foot TEL pole, with a GUY wire marked by an orange ball, immediate off the southwest corner of runway 12, on the pilots right during runway 12 approach.
FAA text
35 FT TEL POLE, WITH A GUY WIRE MKD BY AN ORANGE BALL, IMT OFF THE SW CORNER OF RWY 12, ON THE PILOTS RIGHT DRG RWY 12 APCH.
Remark
Remark updated: 35 foot TEL pole, with power lines marked with two orange balls, immediate off the airstrip, on the runway 30 CTR. If landing runway 30, pilots should offset their touchdown point to halfway down the runway to avoid the TEL pole. Runway 12 prefer for landing.
FAA text
35 FT TEL POLE, WITH PLINES MKD WITH TWO ORANGE BALLS, IMT OFF THE AIRSTRIP, ON THE RWY 30 CTR. IF LDG RWY 30, PILOTS SHOULD OFFSET THEIR TD POINT TO HALFWAY DOWN THE RWY TO AVOID THE TEL POLE. RWY 12 PREF FOR LDG.
▶Effective 15 May 2025ACT 1FYI 5
Remark
New remark: 35 foot TEL pole, with a GUY wire marked by an orange ball, immediate off the southwest corner of runway 11, on the pilots right during runway 11 approach.
FAA text
35 FT TEL POLE, WITH A GUY WIRE MKD BY AN ORANGE BALL, IMT OFF THE SW CORNER OF RWY 11, ON THE PILOTS RIGHT DRG RWY 11 APCH.
Remark
New remark: 35 foot TEL pole, with power lines marked with two orange balls, immediate off the airstrip, on the runway 29 CTR. If landing runway 29, pilots should offset their touchdown point to halfway down the runway to avoid the TEL pole. Runway 11 prefer for landing.
FAA text
35 FT TEL POLE, WITH PLINES MKD WITH TWO ORANGE BALLS, IMT OFF THE AIRSTRIP, ON THE RWY 29 CTR. IF LDG RWY 29, PILOTS SHOULD OFFSET THEIR TD POINT TO HALFWAY DOWN THE RWY TO AVOID THE TEL POLE. RWY 11 PREF FOR LDG.
▶Effective 28 Nov 2024FYI 1
Airport
New airport added to FAA database: Barker Fld, runway 12/30 1008x80 ft turf, CTAF 122.9
Data: history · built 26 Nov 2026 0920Z
FAA cycle 24 Dec 2026 (upcoming) · updated . Not for navigation. Amend can be wrong, late or incomplete, and a change that isn't shown here can still be real. Always use official FAA publications, NOTAMs and a proper preflight briefing. Amend is independent and not affiliated with the FAA. Data: FAA NASR and d-TPP. How it works · Status · Changelog · Privacy · Terms · Report a problem