amend
FAA cycle 24 Dec 2026 (upcoming) · updated
Kenosha, WI · Upcoming 24 Dec 2026 cycle

ENW KENW

Kenosha Rgnl
No changes found at ENW yetThe FAA hasn't posted this cycle's instrument procedures yet, so approach and other procedure changes aren't shown yet. Amend adds them once the FAA does.

History since Aug 2024

▶Effective 09 Jul 2026IFR 5FYI 4
Chart
Approach ILS OR LOC RWY 07L redrawn (still amdt 4)
Chart
Approach RNAV (GPS) RWY 07L redrawn (still amdt 1B)
Chart
Approach RNAV (GPS) RWY 15 redrawn (still amdt 0C)
Chart
Approach RNAV (GPS) RWY 25R redrawn (still amdt 1)
Chart
Approach RNAV (GPS) RWY 33 redrawn (still amdt 0C)
Remark
Remark updated: When Airport Traffic Control Tower is closed, HIRL runway 07L/25R preset on low intensity; to increase intensity and activate MALSR runway 07L; REIL runway 15, 25R and 33; PAPI runway 07L, 07R, 25L and 25R; HIRL runway 07L/25R and 15/33; MIRL runway 07R/25L - click the mic on Common Traffic Advisory Frequency. VASI runway 15 and 33 operates continuously.
FAA text
WHEN ATCT CLSD, HIRL RWY 07L/25R PRESET ON LOW INTST; TO INCR INTST & ACTVT MALSR RWY 07L; REIL RWY 15, 25R & 33; PAPI RWY  07L, 07R, 25L & 25R; HIRL RWY 07L/25R & 15/33; MIRL RWY 07R/25L - CTAF.  VASI RWY 15 & 33 OPRS CONSLY.
Runway
Runway 15: runway end identifier lights (REIL): no → yes
Runway
Runway 33: runway end identifier lights (REIL): no → yes
Chart
Airport diagram changed
▶Effective 11 Jun 2026ACT 1
Remark
New remark: surface incident risk. Taxiway D and taxiway E. Intersection not visible from tower.
FAA text
SFC INCIDENT RISK.  TWY D AND TWY E.  INTXN NOT VSB FM TWR..
▶Effective 27 Nov 2025FYI 6
Airport
Fuel: added Jet A, kerosene, with FS-II (A+); dropped Jet A, kerosene, without FS-II (A)
Runway
Runway 07R/25L: surface: asphalt or bituminous concrete / portland cement concrete (ASPH-CONC) → asphalt or bituminous concrete (ASPH)
Runway
Runway 07R: markings now in fair condition
Runway
Runway 15/33: pavement now in excellent condition; surface: portland cement concrete (CONC) → asphalt or bituminous concrete (ASPH)
Runway
Runway 15: controlling obstacle changed (now 58 ft tall, 1150 ft from threshold, 270 ft left of centerline, clearance slope 16:1)
Runway
Runway 25L: controlling obstacle changed (now 34 ft tall, 850 ft from threshold, 25 ft left of centerline, clearance slope 19:1); markings now in fair condition; controlling obstacle: none → TREES
▶Effective 15 May 2025ACT 1
Remark
Remark removed: Airport Traffic Control Tower operated by Midwest Aviation.
FAA text
ATCT OPERATED BY MIDWEST AVIATION.
▶Effective 05 Sep 2024IFR 1
Procedure
Arrival/departure procedures new or updated: ACCRA, GOPAC3, UECKR

Data: history · built 26 Nov 2026 0920Z

Before you use Amend

Amend is not for navigation. It shows what changed in FAA data, in plain English, and it can be wrong, late or incomplete. A change that isn't shown here can still be real.

Always use current official FAA publications, NOTAMs and a proper preflight briefing. As pilot in command, you're responsible for your flight.

By pressing I understand, you agree to the terms of use. Amend remembers this in your browser only.

FAA cycle 24 Dec 2026 (upcoming) · updated . Not for navigation. Amend can be wrong, late or incomplete, and a change that isn't shown here can still be real. Always use official FAA publications, NOTAMs and a proper preflight briefing. Amend is independent and not affiliated with the FAA. Data: FAA NASR and d-TPP. How it works · Status · Changelog · Privacy · Terms · Report a problem