Chignik Lake, AK · Upcoming 24 Dec 2026 cycle
A79
Chignik Lake
No changes found at A79 yetThe FAA hasn't posted this cycle's instrument procedures yet, so approach and other procedure changes aren't shown yet. Amend adds them once the FAA does.
History since Aug 2024
▶Effective 01 Oct 2026FYI 9
Remark
New runway 08 controlling obstacle clearance slope remark: Brush abeam threshold.
FAA text
BRUSH ABM THR.
Remark
New runway 08/26 pavement condition remark: Soft & rutted; irregular marked W cones.
FAA text
SOFT & RUTTED; IREG MRKD W CONES.
Remark
New runway 26 controlling obstacle clearance slope remark: Brush abeam threshold.
FAA text
BRUSH ABM THR.
Remark
Removed remark: A hill south of runway 08/26 is 150 feet high and runs parallel to the runway.
FAA text
HILL S OF RY 08/26 150 FT HIGH; RUNS PARALLEL TO RY.
Remark
Removed remark: Runway slopes down toward the west.
FAA text
RY SLOPES DOWN TOWARD THE WEST.
Remark
Revised remark: 15 foot brush along runway. 150 foot hill south parallel to runway. Down slope to W.
FAA text
15 FT BRUSH ALG RWY. 150 FT HILL S PARL TO RWY. DOWN SLOPE TO W.
Remark
Revised remark: 4 inches rocks; crown NA full length.
NA is left as the FAA wrote it: it can mean not authorized or not available, and Amend doesn't guess which.
FAA text
4 IN ROCKS; CROWN NA FULL LEN.
Remark
Revised remark: Safety areas are rough, rutted, and uneven.
FAA text
SAFETY AREAS ROUGH, RUTTED & UNEVEN.
Remark
Revised remark: runway condition UNMNT recommend visual inspect before use.
FAA text
RWY COND UNMNT RCMD VISUAL INSP BFR USE.
Data: history · built 26 Nov 2026 0920Z
FAA cycle 24 Dec 2026 (upcoming) · updated . Not for navigation. Amend can be wrong, late or incomplete, and a change that isn't shown here can still be real. Always use official FAA publications, NOTAMs and a proper preflight briefing. Amend is independent and not affiliated with the FAA. Data: FAA NASR and d-TPP. How it works · Status · Changelog · Privacy · Terms · Report a problem