Alliance, OH · Upcoming 24 Dec 2026 cycle
2D1
Lee Fld
No changes found at 2D1 yetThe FAA hasn't posted this cycle's instrument procedures yet, so approach and other procedure changes aren't shown yet. Amend adds them once the FAA does.
History since Aug 2024
▶Effective 25 Dec 2025ACT 1FYI 20
Remark
Remark updated: For clearance contact CLEVELAND APCH at 216-352-2323, and when approach is closed contact CLEVELAND ARTCC at 440-774-0223/0490.
FAA text
FOR CD CTC CLEVELAND APCH AT 216-352-2323, WHEN APCH CLSD CTC CLEVELAND ARTCC AT 440-774-0223/0490.
Airport
Airframe repair: major → none; fuel: dropped 100LL gasoline (low lead) (blue) (100LL); services: dropped pilot instruction (INSTR), aircraft rental (RNTL), aircraft sales (SALES); engine repair: major → none
Remark
New remark: Night operations NA.
NA is left as the FAA wrote it: it can mean not authorized or not available, and Amend doesn't guess which.
FAA text
NGT OPS NA.
Remark
New remark: obstruction clearance slope 0:1 over 3 foot crops, 0 feet distance, 40 feet L.
FAA text
OBSTN CLNC SLP 0:1 OVR 3 FT CROPS, 0 FT DIST, 40 FT L.
Remark
New remark: obstruction clearance slope 0:1 over 55 feet trees, 0 feet distance, 110 feet L.
FAA text
OBSTN CLNC SLP 0:1 OVR 55 FT TREES, 0 FT DIST, 110 FT L.
Remark
New remark: obstruction clearance slope 1:1 over 25 foot telephone pole/line, 35 feet distance, 125 feet B.
FAA text
OBSTN CLNC SLP 1:1 OVR 25 FT FONE POLE/LINE, 35 FT DIST, 125 FT B.
Remark
New remark: Prior coordination required for transient hangar.
FAA text
PRIOR CDN RQRD FOR TSNT HNGR.
Remark
New remark: Prior coordination required for transient tiedown, no anchors/ropes.
FAA text
PRIOR CDN RQRD FOR TSNT TIEDOWN, NO ANCHORS/ROPES.
Remark
Remark removed: Runways soft in spring and when wet.
FAA text
RWYS SOFT IN SPRING & WHEN WET.
Remark
Remark updated: obstacle clearance slope 1:1 over +15 foot road, 20 feet distance, 125 feet left/right.
FAA text
OBSTN CLNC SLP 1:1 OVR +15 FT ROAD, 20 FT DIST, 125 FT L/R.
Remark
Remark updated: prior permission required for winter operation - contact airport manager.
FAA text
PPR FOR WINTER OPS - CTC AMGR.
Runway
Runway 09: controlling obstacle changed (now 25 ft tall, 35 ft from threshold, 60 ft either side of centerline, clearance slope 1:1); controlling obstacle: TREES → PLINE
Runway
Runway 18: controlling obstacle changed (now 15 ft tall, 20 ft from threshold, 125 ft either side of centerline, clearance slope 1:1); controlling obstacle: TREES → ROAD
Runway
Runway 27: controlling obstacle changed (now 55 ft tall, 0 ft from threshold, 110 ft left of centerline, clearance slope 0:1)
Runway
Runway 36: controlling obstacle changed (now 3 ft tall, 0 ft from threshold, 40 ft left of centerline, clearance slope 0:1)
Data: history · built 26 Nov 2026 0920Z
FAA cycle 24 Dec 2026 (upcoming) · updated . Not for navigation. Amend can be wrong, late or incomplete, and a change that isn't shown here can still be real. Always use official FAA publications, NOTAMs and a proper preflight briefing. Amend is independent and not affiliated with the FAA. Data: FAA NASR and d-TPP. How it works · Status · Changelog · Privacy · Terms · Report a problem