Jacksonville, FL · Upcoming 24 Dec 2026 cycle
VQQ KVQQ
Cecil
No changes found at VQQ yetThe FAA hasn't posted this cycle's instrument procedures yet, so approach and other procedure changes aren't shown yet. Amend adds them once the FAA does.
History since Aug 2024
▶Effective 29 Oct 2026ACT 1IFR 1
▶Effective 03 Sep 2026IFR 1
▶Effective 09 Jul 2026FYI 1
▶Effective 16 Apr 2026FYI 1
Remark
Remark removed: Approach slope 33:1; +47 foot trees 2000 feet from landing area.
FAA text
APCH SLOPE 33:1; +47 FT TREES 2000 FT FM LNDG AREA.
▶Effective 19 Feb 2026ACT 1
Remark
New remark: 24 hour prior permission required for aircraft equipped with weather modification or geoengineering equipment 904-741-2020
FAA text
24 HR PPR FOR ACFT EQUIPPED WITH WEATHER MODIFICATION OR GEOENGINEERING EQPT 904-741-2020
▶Effective 17 Apr 2025IFR 1FYI 5
Remark
New remark: Air to Fixed Base Operator communications (MILLION AIR) available on 130.925.
FAA text
AIR TO FBO COMMUNICATIONS (MILLION AIR) AVBL ON 130.925.
Runway
Runway H1: controlling obstacle changed (now , clearance slope 20:1); Part 77 runway category: none → utility runway with a visual approach (A(V))
Runway
Runway H2: controlling obstacle changed (now , clearance slope 20:1); Part 77 runway category: none → utility runway with a visual approach (A(V))
▶Effective 05 Sep 2024IFR 1
Data: history · built 26 Nov 2026 0920Z
FAA cycle 24 Dec 2026 (upcoming) · updated . Not for navigation. Amend can be wrong, late or incomplete, and a change that isn't shown here can still be real. Always use official FAA publications, NOTAMs and a proper preflight briefing. Amend is independent and not affiliated with the FAA. Data: FAA NASR and d-TPP. How it works · Status · Changelog · Privacy · Terms · Report a problem