Potsdam, NY · Upcoming 24 Dec 2026 cycle
PTD KPTD
Potsdam Muni/Damon Fld
No changes found at PTD yetThe FAA hasn't posted this cycle's instrument procedures yet, so approach and other procedure changes aren't shown yet. Amend adds them once the FAA does.
History since Aug 2024
▶Effective 09 Jul 2026FYI 2
Runway
Runway 06: controlling obstacle changed (now 35 ft tall, 749 ft from threshold, 200 ft left of centerline, clearance slope 15:1)
Runway
Runway 24: controlling obstacle changed (now 121 ft tall, 1824 ft from threshold, 286 ft right of centerline, clearance slope 13:1)
▶Effective 19 Mar 2026FYI 2
Runway
Runway 06: runway end elevation: 470.9 → 471.1 ft MSL; touchdown zone elevation: 473.9 → 474.3 ft MSL; threshold crossing height: 45 → 42 ft AGL
Runway
Runway 24: runway end elevation: 468.1 → 468.3 ft MSL; touchdown zone elevation: 473.9 → 474.3 ft MSL; threshold crossing height: 45 → 41 ft AGL
Data: history · built 26 Nov 2026 0920Z
FAA cycle 24 Dec 2026 (upcoming) · updated . Not for navigation. Amend can be wrong, late or incomplete, and a change that isn't shown here can still be real. Always use official FAA publications, NOTAMs and a proper preflight briefing. Amend is independent and not affiliated with the FAA. Data: FAA NASR and d-TPP. How it works · Status · Changelog · Privacy · Terms · Report a problem