Tombstone, AZ · Upcoming 24 Dec 2026 cycle
P29
Tombstone Muni
No changes found at P29 yetThe FAA hasn't posted this cycle's instrument procedures yet, so approach and other procedure changes aren't shown yet. Amend adds them once the FAA does.
History since Aug 2024
▶Effective 11 Jun 2026FYI 4
Airport
Airframe repair: minor → none; fuel: dropped 100LL gasoline (low lead) (blue) (100LL), Jet A, kerosene, without FS-II (A); services: dropped pilot instruction (INSTR); engine repair: minor → none
Runway
Runway 06: controlling obstacle changed (now 4 ft tall, 214 ft from threshold, 90 ft right of centerline, clearance slope 3:1)
Runway
Runway 24: controlling obstacle changed (now 8 ft tall, 250 ft from threshold, 65 ft left of centerline, clearance slope 6:1)
▶Effective 02 Oct 2025FYI 1
Airport
Airport phone number: 520-720-7125 → 520-457-3415; airport contact: Roy Jones C/O Southwestern Aviation → Jesse Grassman
Data: history · built 26 Nov 2026 0920Z
FAA cycle 24 Dec 2026 (upcoming) · updated . Not for navigation. Amend can be wrong, late or incomplete, and a change that isn't shown here can still be real. Always use official FAA publications, NOTAMs and a proper preflight briefing. Amend is independent and not affiliated with the FAA. Data: FAA NASR and d-TPP. How it works · Status · Changelog · Privacy · Terms · Report a problem