Menomonie, WI · Upcoming 24 Dec 2026 cycle
LUM KLUM
Menomonie Muni/Score Fld
No changes found at LUM yetThe FAA hasn't posted this cycle's instrument procedures yet, so approach and other procedure changes aren't shown yet. Amend adds them once the FAA does.
History since Aug 2024
▶Effective 29 Oct 2026IFR 6FYI 4
Runway
Runway 09: controlling obstacle: none listed → TREES 20 ft tall, 450 ft from threshold, 365 ft left of centerline; obstacle clearance slope: 34:1 → 12:1; marking condition: fair → good
Runway
Runway 36: controlling obstacle: none listed → TREES 44 ft tall, 930 ft from threshold, 160 ft right of centerline; obstacle clearance slope: 20:1 → 16:1; marking condition: fair → good
▶Effective 04 Sep 2025ACT 2
Frequency
Frequency 118.025 now listed for LUM AWOS-3PT (was LUM AWOS-3); served facility type: AWOS-3 → AWOS-3PT
▶Effective 15 May 2025ACT 4
▶Effective 23 Jan 2025ACT 1FYI 4
Remark
Remark updated: MIRL runway 9/27 preset to low sunset to sunrise; to increase intensity and activate REIL runways 09 & 27; PAPI runways 09, 18, 27, & 36; MIRL runway 09/27 & 18/36 - click the mic on CTAF.
FAA text
MIRL RWY 9/27 PRESET TO LOW SS-SR; TO INCR INTST AND ACTVT REIL RWYS 09 & 27; PAPI RWYS 09, 18, 27, & 36; MIRL RWY 09/27 & 18/36 - CTAF.
Remark
Remark removed: This airport has been surveyed by the National Geodetic Survey.
FAA text
THIS AIRPORT HAS BEEN SURVEYED BY THE NATIONAL GEODETIC SURVEY.
Runway
Runway 09: runway end elevation: 892.2 → 892.3 ft MSL; threshold crossing height: 48 → 36 ft AGL
Runway
Runway 18: runway end elevation: 895.1 → 895 ft MSL; touchdown zone elevation: 895.1 → 895 ft MSL; threshold crossing height: 43 → 36 ft AGL
Runway
Runway 27: runway end elevation: 892.8 → 892.6 ft MSL; threshold crossing height: 45 → 40 ft AGL
▶Effective 26 Dec 2024FYI 2
Runway
Runway 18: Part 77 runway category: other than utility runway with a visual approach (B(V)) → utility runway with a visual approach (A(V))
Runway
Runway 36: Part 77 runway category: other than utility runway with a visual approach (B(V)) → utility runway with a visual approach (A(V))
Data: history · built 26 Nov 2026 0920Z
FAA cycle 24 Dec 2026 (upcoming) · updated . Not for navigation. Amend can be wrong, late or incomplete, and a change that isn't shown here can still be real. Always use official FAA publications, NOTAMs and a proper preflight briefing. Amend is independent and not affiliated with the FAA. Data: FAA NASR and d-TPP. How it works · Status · Changelog · Privacy · Terms · Report a problem