amend
FAA cycle 29 Oct 2026 (upcoming) · updated
Los Banos, CA · Upcoming 29 Oct 2026 cycle

LSN KLSN

Los Banos Muni
Get alerts
No upcoming changes at LSNOn 29 Oct 2026 · current data stays the same

History since Aug 2024

▶Effective 03 Sep 2026ACT 1FYI 1
Remark
Remark removed: COMMUNICATIONS PRVDD BY FRESNO RADIO ON FREQ 122.1R (PANOCHE RCO).
FAA text
COMMUNICATIONS PRVDD BY FRESNO RADIO ON FREQ 122.1R (PANOCHE RCO).
Frequency
Flight service (FSS) 122.1R via the Panoche outlet no longer available
▶Effective 11 Jun 2026FYI 1
Remark
Remark removed: WDSPR OPEN, UNSEALED CRACKS AND JOINTS. THERE ARE CRACKS OVER 2 INS WIDE WITH RAVELING IN 25 PCT OF THE CRACKS. CRACKS ARE GENLY SPACED 5 TO 50 FT APART WITH SFC AND SLAB SPALLING. ALLIGATOR CRACKING OR PATCHES ARE IN POOR COND AND COVER UP TO 20 PCT OF THE SFC, OR THERE IS VEGETATION THRU THE CRACKS AND JOINTS.
FAA text
WDSPR OPEN, UNSEALED CRACKS AND JOINTS.  THERE ARE CRACKS OVER 2 INS WIDE WITH RAVELING IN 25 PCT OF THE CRACKS.  CRACKS ARE GENLY SPACED 5 TO 50 FT APART WITH SFC AND SLAB SPALLING.  ALLIGATOR CRACKING OR PATCHES ARE IN POOR COND AND COVER UP TO 20 PCT OF THE SFC, OR THERE IS VEGETATION THRU THE CRACKS AND JOINTS.
▶Effective 25 Dec 2025FYI 1
Runway
Runway 14/32: pavement now in fair condition
▶Effective 27 Nov 2025FYI 1
Airport
Name changed: Charles Bergson → Marc Heguy
▶Effective 05 Sep 2024FYI 1
Remark
Remark removed: Director of Public Works. MARK.FACHIN@LOSBANOS.ORG
FAA text
DIRECTOR OF PUBLIC WORKS.  MARK.FACHIN@LOSBANOS.ORG

Data: history · built 09 Oct 2026 1931Z

FAA cycle 29 Oct 2026 (upcoming) · updated . Not for navigation. Always use official FAA publications, NOTAMs and a proper preflight briefing. Amend is independent and not affiliated with the FAA. Data: FAA NASR and d-TPP. How it works · Status · Changelog · Privacy · Terms · Report a problem · Source