Conway, SC · Upcoming 24 Dec 2026 cycle
HYW KHYW
Conway-Horry County
No changes found at HYW yetThe FAA hasn't posted this cycle's instrument procedures yet, so approach and other procedure changes aren't shown yet. Amend adds them once the FAA does.
History since Aug 2024
▶Effective 09 Jul 2026IFR 2
▶Effective 14 May 2026FYI 1
Runway
Runway 04/22: pavement now in excellent condition; surface: asphalt or bituminous concrete (ASPH) → portland cement concrete (CONC); surface treatment: no special surface treatment (NONE) → saw-cut or plastic grooved (GRVD)
▶Effective 12 Jun 2025FYI 1
Runway
Runway 04: controlling obstacle changed (now 89 ft tall, 1776 ft from threshold, 220 ft left of centerline, clearance slope 17:1)
Data: history · built 26 Nov 2026 0920Z
FAA cycle 24 Dec 2026 (upcoming) · updated . Not for navigation. Amend can be wrong, late or incomplete, and a change that isn't shown here can still be real. Always use official FAA publications, NOTAMs and a proper preflight briefing. Amend is independent and not affiliated with the FAA. Data: FAA NASR and d-TPP. How it works · Status · Changelog · Privacy · Terms · Report a problem