West Palm Beach, FL · Upcoming 29 Oct 2026 cycle
F45
North Palm Beach County General Aviation
Get alerts
IFR procedures2
Procedure
Arrival/departure procedures new or updated: VUUDU2 → VUUDU3
Details
VUUDU2 → VUUDU3: same waypoints and transitions; altitudes, speeds or notes may have changed, check the chart
History since Aug 2024
▶Effective 03 Sep 2026ACT 1IFR 5FYI 5
Runway
Runway 27R: runway end elevation: 20.8 → 21 ft MSL; touchdown zone elevation: 22 → 21.4 ft MSL
▶Effective 09 Jul 2026ACT 2IFR 9
▶Effective 19 Mar 2026FYI 4
▶Effective 22 Jan 2026FYI 1
Remark
Remark updated: 24 HR PPR REQSTD FOR ALL ACFT EQUIPPED WITH WEATHER MODIFICATION EQPT OR ACFT CPBL OF WEATHER MODIFICATION AND/OR GEOENGINEERING BY CTC THE DEPT OF ARPT COMMUNICATIONS CNTR AT (561) 471-7420.
FAA text
24 HR PPR REQSTD FOR ALL ACFT EQUIPPED WITH WEATHER MODIFICATION EQPT OR ACFT CPBL OF WEATHER MODIFICATION AND/OR GEOENGINEERING BY CTC THE DEPT OF ARPT COMMUNICATIONS CNTR AT (561) 471-7420.
▶Effective 27 Nov 2025ACT 1
Remark
New remark: 24-HR PPR REQSTD FOR ALL ACFT EQUIPPED WITH WEATHER MODIFICATION EQPT OR ACFT CPBL OF WEATHER MODIFICATION AND/OR GEOENGINEERING BY CTC THE DEPT OF ARPT COMMUNICATIONS CNTR AT (561) 471-7420.
FAA text
24-HR PPR REQSTD FOR ALL ACFT EQUIPPED WITH WEATHER MODIFICATION EQPT OR ACFT CPBL OF WEATHER MODIFICATION AND/OR GEOENGINEERING BY CTC THE DEPT OF ARPT COMMUNICATIONS CNTR AT (561) 471-7420.
▶Effective 20 Feb 2025ACT 1FYI 4
Remark
Remark updated: 09L/27R THLDS MKD WITH PVC PIPES.
FAA text
09L/27R THLDS MKD WITH PVC PIPES.
▶Effective 05 Sep 2024IFR 1
FAA cycle 29 Oct 2026 (upcoming) · updated . Not for navigation. Always use official FAA publications, NOTAMs and a proper preflight briefing. Amend is independent and not affiliated with the FAA. Data: FAA NASR and d-TPP. How it works · Status · Changelog · Privacy · Terms · Report a problem · Source