Sun City, AZ · Upcoming 24 Dec 2026 cycle
AZ08
Banner Boswell Meml Hospital
No changes found at AZ08 yetThe FAA hasn't posted this cycle's instrument procedures yet, so approach and other procedure changes aren't shown yet. Amend adds them once the FAA does.
History since Aug 2024
▶Effective 25 Dec 2025FYI 4
Remark
Remark removed: Existing rooftop helipad has been demolished. Future tower heliport expected to be completed/operational August 2020. Existing heliport is ground-level, elevated approx +7 feet above surrounding grade.
FAA text
EXISTING ROOFTOP HELIPAD HAS BEEN DEMOLISHED. FUTURE TOWER HELIPORT EXPECTED TO BE COMPLETED/OPERATIONAL AUG 2020. EXISTING HELIPORT IS GROUND-LEVEL, ELEVATED APPROX 7 FT ABOVE SURROUNDING GRADE.
Remark
Remark updated: 3 foot fence & gate outside landing pad; 5 foot each side. red & white lighted radio tower 0.5 NM W.
FAA text
3 FT FENCE & GATE OUTSIDE LNDG PAD; 5 FT EACH SIDE. RED & WHITE LGTD RDO TWR 0.5 NM W.
Data: history · built 26 Nov 2026 0920Z
FAA cycle 24 Dec 2026 (upcoming) · updated . Not for navigation. Amend can be wrong, late or incomplete, and a change that isn't shown here can still be real. Always use official FAA publications, NOTAMs and a proper preflight briefing. Amend is independent and not affiliated with the FAA. Data: FAA NASR and d-TPP. How it works · Status · Changelog · Privacy · Terms · Report a problem