Stevenson, AL · Upcoming 24 Dec 2026 cycle
7A6
Stevenson
No changes found at 7A6 yetThe FAA hasn't posted this cycle's instrument procedures yet, so approach and other procedure changes aren't shown yet. Amend adds them once the FAA does.
History since Aug 2024
▶Effective 03 Sep 2026FYI 4
Runway
Runway 05: controlling obstacle changed (now 76 ft tall, 1177 ft from threshold, 135 ft right of centerline, clearance slope 12:1)
▶Effective 02 Oct 2025FYI 3
Airport
Airframe repair: major → none; bottled oxygen: low → none; engine repair: major → none
Runway
Runway 05: controlling obstacle changed (now 114 ft tall, 1464 ft from threshold, 183 ft left of centerline, clearance slope 11:1)
Runway
Runway 23: controlling obstacle changed (now 73 ft tall, 1005 ft from threshold, 234 ft left of centerline, clearance slope 11:1)
Data: history · built 26 Nov 2026 0920Z
FAA cycle 24 Dec 2026 (upcoming) · updated . Not for navigation. Amend can be wrong, late or incomplete, and a change that isn't shown here can still be real. Always use official FAA publications, NOTAMs and a proper preflight briefing. Amend is independent and not affiliated with the FAA. Data: FAA NASR and d-TPP. How it works · Status · Changelog · Privacy · Terms · Report a problem