Tempe, AZ · Upcoming 24 Dec 2026 cycle
3AZ7
The Buttes In Tempe
No changes found at 3AZ7 yetThe FAA hasn't posted this cycle's instrument procedures yet, so approach and other procedure changes aren't shown yet. Amend adds them once the FAA does.
History since Aug 2024
▶Effective 10 Jul 2025FYI 3
Remark
Remark removed: (E111-2) a safety barrier be erected around operations area in accordance with AC 150/5390-1B and a LOA be entered into with the PHOENIX-SKY HARBOR ATCT RE COMM requirements ingress/egress routes and simultaneous operations
AC is left as the FAA wrote it: it can mean Advisory Circular or aircraft, and Amend doesn't guess which.
FAA text
(E111-2) A SAFETY BARRIER BE ERECTED AROUND OPS AREA IN ACCORDANCE WITH AC 150/5390-1B & A LOA BE ENTERED INTO WITH THE PHOENIX-SKY HARBOR ATCT RE COMM REQUIREMENTS INGRESS/EGRESS ROUTES &SIMULTANEOUS OPS
Remark
Remark updated: Provided Visual Flight Rules/private use; if operations between sunset & sunrise lighting installed & a safety barrier erected around operations area in accordance with AC 150/5390-1B; letter of agreement be entered into with the PHOENIX-SKY HARBOR Airport Traffic Control Tower re COMM requirements ingress/egress routes & simultaneous operations.
AC is left as the FAA wrote it: it can mean Advisory Circular or aircraft, and Amend doesn't guess which.
FAA text
PRVD VFR/PVT USE; IF OPS BTN SS & SR LIGHTING INSTALLED & A SAFETY BARRIER ERECTED AROUND OPS AREA IN ACCORDANCE WITH AC 150/5390-1B; LOA BE ENTERED INTO WITH THE PHOENIX-SKY HARBOR ATCT RE COMM REQUIREMENTS INGRESS/EGRESS ROUTES & SIMULTANEOUS OPS.
Data: history · built 26 Nov 2026 0920Z
FAA cycle 24 Dec 2026 (upcoming) · updated . Not for navigation. Amend can be wrong, late or incomplete, and a change that isn't shown here can still be real. Always use official FAA publications, NOTAMs and a proper preflight briefing. Amend is independent and not affiliated with the FAA. Data: FAA NASR and d-TPP. How it works · Status · Changelog · Privacy · Terms · Report a problem