Moose Creek Ranger Station, ID · Upcoming 24 Dec 2026 cycle
1U1
Moose Creek /Usfs/
No changes found at 1U1 yetThe FAA hasn't posted this cycle's instrument procedures yet, so approach and other procedure changes aren't shown yet. Amend adds them once the FAA does.
History since Aug 2024
▶Effective 01 Oct 2026FYI 11
Remark
New runway 01 controlling obstacle clearance slope remark: A 300-foot ridge line with rising terrain is at 1/4 mile on the extended centerline.
FAA text
300 FT RIDGE LN/RISING TRRN AT 1/4 MI ON EXTDD CNTRLN.
Remark
New runway 04 controlling obstacle clearance slope remark: 90 foot trees both sides of runway & rising Terrain at 1/4 mile on extended centerline.
FAA text
90 FT TREES BOTH SIDES OF RWY & RISING TRRN AT 1/4 MI ON EXTDD CNTRLN.
Remark
New runway 19 controlling obstacle clearance slope remark: Controlling obstruction 150 foot tree 0 feet, 170 foot RT; trees 100 feet, around runway end 19.
FAA text
CTLG OBSTN 150 FT TREE 0 FT, 170 FT RT; TREES 100 FT, ARND RWY END 19.
Remark
Removed remark: Runway 19 has 100 foot trees and rising terrain at 150 feet on the extended centerline, 250 feet to the left.
FAA text
RWY 19: 100 FT TREES & RISING TRRN AT 150 FT ON EXTDD CNTRLN, 250 FT LEFT.
Remark
Revised remark: 100 foot trees 150 feet on extended centerline, 250 feet left.
FAA text
100 FT TREES 150 FT ON EXTDD CNTRLN, 250 FT L.
Remark
Revised remark: Runway 01/19 muddy spring and winter, use runway 04/22 early spring and late fall/winter when possible due to better drainage and firmer surface, runways subject to TEMP closures.
TEMP is left as the FAA wrote it: it can mean temporary or temperature, and Amend doesn't guess which.
FAA text
RWY 01/19 MUDDY SPRING & WINTER. USE RWY 04/22 EARLY SPRING & LATE FALL/WINTER WHEN PSBL DUE TO BETTER DRAINAGE & FIRMER SFC. RWYS SUBJECT TO TEMP CLOSURES.
Remark
Revised remark: Runways 01/19 and 04/22 may not be mowed to full width.
FAA text
RWYS 01/19 & 04/22 MAY NOT BE MOWED TO FULL WIDTH.
Runway
Runway 19: controlling obstacle: TREES 100 ft tall, 150 ft from threshold, 250 ft left of centerline → TREES 150 ft tall, 0 ft from threshold, 170 ft right of centerline; obstacle clearance slope: 1:1 → 0:1
Runway
Runway 22: controlling obstacle: TREES 130 ft tall, 175 ft from threshold, 0 ft either side of centerline → TREES 125 ft tall, 155 ft from threshold, 0 ft either side of centerline
Data: history · built 26 Nov 2026 0920Z
FAA cycle 24 Dec 2026 (upcoming) · updated . Not for navigation. Amend can be wrong, late or incomplete, and a change that isn't shown here can still be real. Always use official FAA publications, NOTAMs and a proper preflight briefing. Amend is independent and not affiliated with the FAA. Data: FAA NASR and d-TPP. How it works · Status · Changelog · Privacy · Terms · Report a problem