Lodi, CA · Upcoming 24 Dec 2026 cycle
1O3
Lodi
No changes found at 1O3 yetThe FAA hasn't posted this cycle's instrument procedures yet, so approach and other procedure changes aren't shown yet. Amend adds them once the FAA does.
History since Aug 2024
▶Effective 25 Dec 2025FYI 2
Remark
Remark removed: runway 12/30 pavement is in poor condition, with cracking, raveling, and edges that drop off more than three inches extending over much of the surface and sides.
FAA text
RWY 12/30 PAVEMENT IS IN POOR COND, WITH CRACKING, RAVELING, AND EDGES THAT DROP OFF MORE THAN THREE INCHES EXTDG OVER MUCH OF THE SFC AND SIDES.
Data: history · built 26 Nov 2026 0920Z
FAA cycle 24 Dec 2026 (upcoming) · updated . Not for navigation. Amend can be wrong, late or incomplete, and a change that isn't shown here can still be real. Always use official FAA publications, NOTAMs and a proper preflight briefing. Amend is independent and not affiliated with the FAA. Data: FAA NASR and d-TPP. How it works · Status · Changelog · Privacy · Terms · Report a problem