Ellinwood, KS · Upcoming 24 Dec 2026 cycle
1K6
Ellinwood Muni
No changes found at 1K6 yetThe FAA hasn't posted this cycle's instrument procedures yet, so approach and other procedure changes aren't shown yet. Amend adds them once the FAA does.
History since Aug 2024
▶Effective 03 Sep 2026FYI 6
Remark
New remark: Also 15 foot RD, 75 feet distance, 130 feet left/right, obstruction clearance slope 5:1.
FAA text
ALSO 15 FT RD, 75 FT DSTC, 130 FT L/R, OBSTN CLNC SLOPE 5:1.
Remark
Remark removed: Road at 70 feet left centerline of runway 26. Power line underground in approach path.
FAA text
ROAD AT 70 FT LEFT CNTRLN OF RY 26. POWER LINE UNDERGROUND IN APCH PATH.
Remark
Remark updated: 2 foot ditch at runway 26 threshold.
FAA text
2 FT DITCH AT RWY 26 THLD.
Runway
Runway 17: controlling obstacle changed (now 15 ft tall, 60 ft from threshold, 0 ft either side of centerline, clearance slope 4:1)
Runway
Runway 26: controlling obstacle changed (now 15 ft tall, 0 ft from threshold, 70 ft left of centerline, clearance slope 0:1)
Data: history · built 26 Nov 2026 0920Z
FAA cycle 24 Dec 2026 (upcoming) · updated . Not for navigation. Amend can be wrong, late or incomplete, and a change that isn't shown here can still be real. Always use official FAA publications, NOTAMs and a proper preflight briefing. Amend is independent and not affiliated with the FAA. Data: FAA NASR and d-TPP. How it works · Status · Changelog · Privacy · Terms · Report a problem