Tatum, NM · Upcoming 24 Dec 2026 cycle
18T
Tatum
No changes found at 18T yetThe FAA hasn't posted this cycle's instrument procedures yet, so approach and other procedure changes aren't shown yet. Amend adds them once the FAA does.
History since Aug 2024
▶Effective 14 May 2026FYI 5
Remark
New remark: 6 inches to 12 inches vegetation in all on airport pavements; ramp tie downs covered by vegetation, 2 feet to 10 feet SCTRD brush north side transition area.
FAA text
6"-12" VEGETATION IN ALL ON ARPT PAVEMENTS; RAMP TIE DOWNS COVERED BY VEGETATION, 2 FT-10 FT SCTRD BRUSH NORTH SIDE TRANSITION AREA.
Remark
New remark: Numerous unfilled cracks with 1 foot vegetation.
FAA text
NUMEROUS UNFILLED CRACKS WITH 1 FT VEGETATION.
Remark
Remark updated: Runway 12 marking faded or missing red "X" on number.
FAA text
RWY 12 MRKG FADED OR MISSING RED "X" ON NMBR.
Remark
Remark updated: runway 30 marking faded or missing. red "X" on runway number.
FAA text
RWY 30 MARKING FADED OR MISSING.RED "X" ON RWY NMBR.
▶Effective 19 Mar 2026FYI 1
Data: history · built 26 Nov 2026 0920Z
FAA cycle 24 Dec 2026 (upcoming) · updated . Not for navigation. Amend can be wrong, late or incomplete, and a change that isn't shown here can still be real. Always use official FAA publications, NOTAMs and a proper preflight briefing. Amend is independent and not affiliated with the FAA. Data: FAA NASR and d-TPP. How it works · Status · Changelog · Privacy · Terms · Report a problem