{"schema_version":1,"airport":"LA69","entries":[{"cycle":"2024-11-28","from_cycle":"2024-10-31","id":"8e84cd8cd3a2","priority":"action","category":"runway","kind":"changed","summary":"runway H1: pavement now in fair condition; length: 1500 -> 60 ft; width: 300 -> 60 ft","source":"APT_RWY","fields":[{"field":"COND","old":"","new":"FAIR"},{"field":"RWY_LEN","old":"1500","new":"60"},{"field":"RWY_WIDTH","old":"300","new":"60"}]},{"cycle":"2024-11-28","from_cycle":"2024-10-31","id":"416a1244cbe7","priority":"fyi","category":"airport","kind":"changed","summary":"name changed: Jim Jenkins -> Jenkins Construction Corp.","source":"APT_CON","fields":[{"field":"NAME","old":"JIM JENKINS","new":"JENKINS CONSTRUCTION CORP."}]}],"first_cycle":"2024-11-28","last_cycle":"2024-11-28"}